CAPEX & Lifecycle Model
Integrated Generator vs Conventional Distribution
Avoided transformers & MV/LV switchgear, all-in CAPEX and total cost of ownership — per campus.
Campus & equipment
Campus size
100
MW
HyperTech OE cost ($M)
Development / BoP ($M)
Development is…
Per-project
One-time NRE
Amortise NRE over
10
campuses
Avoided conventional CAPEX
Avoided distribution gear
$
1150
/kW
Deletes: 13.8 kV switchgear · vacuum breakers · 3 MVA transformers · LV switchboards · 480 V breakers & busway.
Range: $680/kW (downstream only) → $1,500/kW (full 138 kV substation + downstream + SST).
Lifecycle (operating)
Capacity factor
90
%
Asset life
25
yr
Heat rate (Btu/kWh)
Fuel price ($/MMBtu)
O&M ($/MWh)
—
All-in CAPEX (HyperTech)
—
—
Avoided conventional CAPEX
—
—
Net CAPEX position
—
CAPEX comparison — power system + distribution
Conventional: gen + distribution
HyperTech: integrated, no ext. xfmr
Total cost of ownership (undiscounted, over asset life)
CAPEX (OE + development, campus share)
—
Fuel (
—
/MWh)
—
O&M
—
Lifetime TCO
—
Lifetime energy delivered
—
Levelised cost of energy (approx.)
—